![]() |
| 2007 | ||
|---|---|---|
| 4 | Thomas Volling, Thomas Spengler: Order-driven planning in build-to-order scenarios. Wirtschaftsinformatik (2) 2007: 391- | |
| 2005 | ||
| 3 | EE | Judita Kruse, Clive Thomsen, Rolf Ernst, Thomas Volling, Thomas Spengler: Introducing Flexible Quantity Contracts into Distributed SoC and Embedded System Design Processes. DATE 2005: 938-943 |
| 2003 | ||
| 2 | EE | Thomas Spengler: Management of Material Flows in Closed-Loop Supply Chains. HICSS 2003: 81 |
| 2002 | ||
| 1 | Thomas Spengler, M. Schröter, W. Stölting: Bereitstellung recyclingrelevanter Produktdaten im Rahmen eines stoffstrombasierten Supply Chain Managements. Modelle im E-Business 2002: 301-316 | |
| 1 | Rolf Ernst | [3] |
| 2 | Judita Kruse | [3] |
| 3 | M. Schröter | [1] |
| 4 | W. Stölting | [1] |
| 5 | Clive Thomsen | [3] |
| 6 | Thomas Volling | [3] [4] |